ARIDOD
DRAINAGE & FLOOD CONTROL

FLAGSHIP PROJECT

Kamalapur Storm Water
Pumping Station Project

Urban drainage resilience through storm water pumping infrastructure.

EMPLOYERDhaka Wasa
INVESTORWorld Bank
LOCATIONKamalapur
CONSULTANT / ROLEARIDOD
PROJECT VALUE21 Million USD
STATUSCompleted

SCOPE OF WORK / MAJOR COMPONENTS

  • 3 Nos. 5 cubic meter/sec capacity pumps
  • Motors and inverters
  • Sump construction
  • Bank protection
  • Pump house
  • Internal roads

PROJECT HIGHLIGHTS

  • Designed to significantly mitigate urban flooding in Kamalapur and surrounding low-lying areas.
  • High-capacity pumping system with advanced automation and SCADA for reliable operation.
  • Robust civil and mechanical infrastructure ensuring long-term durability and minimal downtime.
  • Strengthened embankment and bank protection for enhanced flood safety.
  • Environmentally responsible design to ensure proper outfall management into the adjacent waterbody.
  • Successfully completed and delivered to support urban drainage resilience and community safety.

15 m³/sec PUMPING CAPACITY

High-capacity flood control pumping

7,500 m³+ CIVIL WORKS

Concrete works and pump station infrastructure

1.2 km BANK PROTECTION

Resilience and flood safety works

1 PUMP HOUSE

Dedicated pumping station facility

100% DELIVERY STRENGTH

Successful completion and handover