Kamalapur Storm Water
Pumping Station Project
Urban drainage resilience through storm water pumping infrastructure.

EMPLOYERDhaka Wasa
INVESTORWorld Bank
LOCATIONKamalapur
CONSULTANT / ROLEARIDOD
PROJECT VALUE21 Million USD
STATUSCompleted
SCOPE OF WORK / MAJOR COMPONENTS
- 3 Nos. 5 cubic meter/sec capacity pumps
- Motors and inverters
- Sump construction
- Bank protection
- Pump house
- Internal roads
PROJECT HIGHLIGHTS
- ✓Designed to significantly mitigate urban flooding in Kamalapur and surrounding low-lying areas.
- ✓High-capacity pumping system with advanced automation and SCADA for reliable operation.
- ✓Robust civil and mechanical infrastructure ensuring long-term durability and minimal downtime.
- ✓Strengthened embankment and bank protection for enhanced flood safety.
- ✓Environmentally responsible design to ensure proper outfall management into the adjacent waterbody.
- ✓Successfully completed and delivered to support urban drainage resilience and community safety.
15 m³/sec PUMPING CAPACITY
High-capacity flood control pumping
7,500 m³+ CIVIL WORKS
Concrete works and pump station infrastructure
1.2 km BANK PROTECTION
Resilience and flood safety works
1 PUMP HOUSE
Dedicated pumping station facility
100% DELIVERY STRENGTH
Successful completion and handover