ARIDOD
OIL & GAS / PIPELINE PROJECT

FLAGSHIP PROJECT

Chattogram to Dhaka
Oil Pipeline (CDPL)

Transportation of oil through pipeline from Chattogram to Dhaka.

EMPLOYERBangladesh Army
INVESTORGovt. of Bangladesh
LOCATIONChattogram
EPC / ROLEARIDOD
PROJECT VALUEBDT 58 Crore (Excl. Pipes & Accessories)
STATUSCompleted

SCOPE / ROLE

  • Oil pipeline installation and commissioning
  • Welding
  • Non-Destructive Test (X-Ray)
  • Sand blasting & laminating by heat shrink kit
  • Trenching
  • Pipe laying
  • Cathodic protection & holiday testing
  • Backfilling

PROJECT HIGHLIGHTS

  • Strategic long-distance oil pipeline connecting Chattogram refinery to Dhaka terminal to ensure reliable energy supply.
  • Executed with high construction quality and adherence to international pipeline standards.
  • Comprehensive Non-Destructive Testing (X-Ray) to ensure weld integrity and pipeline reliability.
  • Advanced corrosion protection system with sand blasting, laminating and cathodic protection.
  • Efficient trenching, pipe laying and backfilling with strict HSE compliance.
  • Strengthens national energy logistics and contributes to secure fuel supply.

PIPELINE INSTALLATION

Long-distance oil pipeline installation with precision

WELDING & NDT

High-quality welding with X-Ray NDT for integrity

CORROSION PROTECTION

Sand blasting, heat shrink coating and cathodic protection

COMMISSIONING

Testing, flushing and commissioning for safe operation

ENERGY LOGISTICS

Reliable oil transport ensuring national energy security