ARIDOD
OIL & GAS / PIPELINE PROJECT
FLAGSHIP PROJECT
Chattogram to Dhaka
Oil Pipeline (CDPL)
Transportation of oil through pipeline from Chattogram to Dhaka.

EMPLOYERBangladesh Army
INVESTORGovt. of Bangladesh
LOCATIONChattogram
EPC / ROLEARIDOD
PROJECT VALUEBDT 58 Crore (Excl. Pipes & Accessories)
STATUSCompleted
SCOPE / ROLE
- Oil pipeline installation and commissioning
- Welding
- Non-Destructive Test (X-Ray)
- Sand blasting & laminating by heat shrink kit
- Trenching
- Pipe laying
- Cathodic protection & holiday testing
- Backfilling
PROJECT HIGHLIGHTS
- ✓Strategic long-distance oil pipeline connecting Chattogram refinery to Dhaka terminal to ensure reliable energy supply.
- ✓Executed with high construction quality and adherence to international pipeline standards.
- ✓Comprehensive Non-Destructive Testing (X-Ray) to ensure weld integrity and pipeline reliability.
- ✓Advanced corrosion protection system with sand blasting, laminating and cathodic protection.
- ✓Efficient trenching, pipe laying and backfilling with strict HSE compliance.
- ✓Strengthens national energy logistics and contributes to secure fuel supply.
PIPELINE INSTALLATION
Long-distance oil pipeline installation with precision
WELDING & NDT
High-quality welding with X-Ray NDT for integrity
CORROSION PROTECTION
Sand blasting, heat shrink coating and cathodic protection
COMMISSIONING
Testing, flushing and commissioning for safe operation
ENERGY LOGISTICS
Reliable oil transport ensuring national energy security